Pit Project: Updated July 6, 2003 / Img_1330
Jim Ball
07/06/2003
Frontenac, Ks.
jimball@yellowjacketsystems.com
Img_1330.jpg
Detail shot of the end of a frame side tube showing how the tubes are capped with 1/4" x 2" x 3" steel plate.
After welding the caps in place the welds are ground down flush and blended in with the tubing.