Pit Project Update 2/29/04 / IMG_2113
Jim Ball
2/29/2004
jimball@yellowjacketsystems.com
IMG_2113.jpg
Upper door opened showing two of the racks and multiple rack positions available.
Door gaskets will not be installed until right before painting.